2026-05-19
Supply Project of Centrifugal Pump for Russian Chemical Plant Pipeline
Supply Project of Centrifugal Pump for Russian Chemical Plant Pipeline
This export project is customized for a large chemical plant in Perm, Russia. All products have been physically recorded, and the video clearly shows the pump body structure, material details, and packaging status, ensuring the customer has a full understanding of the products before shipment.

The batch consists of 6 types of centrifugal pumps, all made of 304 stainless steel, offering excellent corrosion resistance, suitable for chemical media transfer, cooling circulation, and industrial water supply systems. The specific models and parameters are as follows:
-
WYT/IHG80-125: Flow 30 m³/h, Head 20 m, Power 5.5 kW
-
WYT/IHG50-160: Flow 15 m³/h, Head 30 m, Power 3 kW
-
WYT/IHG50-200A: Flow 15 m³/h, Head 40 m, Power 5.5 kW
-
WYT/IHG50-125: Flow 10 m³/h, Head 20 m, Power 1.5 kW
-
WYT/IHG50-200B: Flow 8 m³/h, Head 40 m, Power 4 kW
-
WYT/IHG80-160: Flow 50 m³/h, Head 30 m, Power 7.5 kW
-
All pumps are equipped with 2‑pole motors (2900 rpm) and packed in standard wooden crates (with large motor fixing), ensuring structural stability during long‑distance transport.
Logistics Arrangements:
The goods will be shipped from Shanghai Port to Port of Saint Petersburg, Russia, and then transferred by rail or road to the chemical plant in Perm. We have coordinated shipping space with several international freight forwarders and carriers. The estimated total transit time is 35–45 days.
The goods will be shipped from Shanghai Port to Port of Saint Petersburg, Russia, and then transferred by rail or road to the chemical plant in Perm. We have coordinated shipping space with several international freight forwarders and carriers. The estimated total transit time is 35–45 days.
Customer Service & Real‑Time Tracking Commitment:
To demonstrate our professionalism and reliability, we provide the Russian customer with full real‑time logistics tracking services, including:
To demonstrate our professionalism and reliability, we provide the Russian customer with full real‑time logistics tracking services, including:
-
Updates on booking, container loading, and customs clearance
-
Real‑time vessel tracking and daily position reports
-
Assistance with transshipment after arrival at Saint Petersburg Port and updates on inland transport status
Advance notification before arrival at the plant, together with support for arrival inspection
Customers can monitor the complete product journey – from factory to port to destination – at any time through our dedicated project portal, email, or instant messaging. We also regularly send on‑site photos and status reports to ensure every step is transparent and controllable.
We firmly believe that this batch of high‑quality 304 stainless steel pipeline pumps will meet the strict requirements of the Russian chemical plant for corrosion resistance and stable operation. Moreover, our fully traceable delivery service will provide solid support for the customer’s project and further strengthen our good reputation in the Russian and CIS markets.